Water Infrastructure Projects Completed

Client: Jacksonville Electric Authority
Location: Jacksonville, FL
Description:  This project utilized open cut trench, dry bore & jack and horizontal directional drill methods to install 3,785 LF of 16” PVC, 2,900 LF of 20” PVC and 2,570 LF of 18” HDPE installed by drill. A total of 240 LF of 18” & 20” steel-encased force main by auger bore was also installed.

Client: Garney Construction
Location: Largo, FL
Description: As a sub-contractor, TBL is installing approximately 28,500 LF of fPVC ranging from 12″-30″ in diameter, broken out as 26 separate drill shots in very poor, karst soil conditions.

Client: Jacksonville Electric Authority (JEA)
Location: Jacksonville, FL
Description: This is a Design/Build project with TBL as the lead contractor and GAI Associates as the design engineer, for the construction of a 30″ diameter reclaim water main that is 2,800 LF and will be installed beneath the St Johns River.

Client: City of Deerfield Beach
Location: Deerfield Beach, FL
Description: TBL constructed an 8″ fire main and 3″ water line by subaqueous HDD connecting facilities on Hillsboro Blvd to Deerfield Island Park.

Client: Popco
Location: Brunswick, St. Simons Island, GA
Description: TBL installed just over 11,000 LF of 14″ and 16″ HDPE force main pipe by directional drill.  Shot sizes ranged from 300 LF to 3,353 LF.

 
Client: JEA
Location: Busch Dr. – Jacksonville, FL
Description: Project included the installation of 3100 LF of 36″ HDPE force main by open cut construction.

Client: Town of Garden City
Location: Garden City / Savannah, GA
Description: Installation of 3,776 LF of 12″ water main by horizontal directional drill to avoid wetlands, including installation of a 24″ casing by jack & bore.

Client: Citrus County Board of County Commissioners
Location: Citrus County, FL
Description: This project included installation approximately 4.5 miles of 4 & 8″ force main by trench and HDD, including demo of existing lift station and construction of a new one.

Client: City of Palm Coast
Location: Palm Coast, Flagler County, FL
Description: Project included installing 11,000 LF of 16″ force main by open trench and 3,300 LF of 18″ force main by directional drill, including the construction of a new master pump station.

Client: St. Johns County, FL
Location: I-95 & International Golf Parkway | Greater St. Augustine, FL
Description: This project included the installation of 12,800 LF of 24″, 20″ and 16″ reclaim water main and 7,000 LF of 20″ & 16″ force main. Construction methods include open trench and directional drill, including a shot under I-95.

Client: Hillsborough County, FL
Location: Tampa, Hillsborough County, FL
Description: Installation of 5,700 LF of 16″ fPVC force main, all by directional drill, including a 24″ auger bore to install a steel casing.